Jun 14, 2019 | U.S. Engineering

Louisville Middle School

The scope of the Boulder Valley School District’s Louisville Middle School project involved demolishing a portion of the existing school and expanding another to house classrooms, a wood shop and a new auditorium. A portion of the construction took place…

Read More


Jun 14, 2019 | U.S. Engineering

Denver Public Schools Energy Conservation Project

The Denver Public Schools energy conservation project consisted of renovating fourteen schools in the Denver metro area.

Read More


Jun 14, 2019 | U.S. Engineering

Vanguard Classical School

The Vanguard Classical School is a public charter school in the Aurora Public School District.

Read More


Jun 14, 2019 | U.S. Engineering

Adams County School District No. 50

The Adams County School District No. 50 (now known as Westminister Public Schools) project included a full mechanical renovation of several schools within the district.

Read More


Jun 14, 2019 | U.S. Engineering

Blue Springs South High School

The Blue Springs South High School project consisted of replacing existing air units. A portion of the project took place while classes were in session and required helicopter assistance for installation. U.S. Engineering, with minimum disruption under a tight schedule, optimized facility operations…

Read More


Jun 14, 2019 | U.S. Engineering

Rockhurst High School

U.S. Engineering performed the mechanical scope on the renovation of Rockhurst High School’s 140,000-sq-ft existing facilities as well as the 30,000-sq-ft west building addition. This project included adding new air conditioning systems and renovating and remodeling plumbing and heating systems….

Read More


Jun 14, 2019 | U.S. Engineering

Van Horn High School

U.S. Engineering performed the mechanical scope of an existing-facility renovation. The project included adding new air conditioning to a school that did not previously have cooling. Two new air-cooled chillers were installed and piped to a fan coil unit and…

Read More


Jun 14, 2019 | U.S. Engineering

Littleton High School

U.S. Engineering performed a major mechanical/plumbing renovation.

Read More


Jun 14, 2019 | U.S. Engineering

Laramie High School

This multi-story, 300,000-sq-ft replacement high school for Albany County School District #1 is the largest in the state of Wyoming.

Read More


Jun 14, 2019 | U.S. Engineering

George Washington High School

U.S. Engineering was the prime mechanical contractor for this design-build project, which was part of an ongoing contract with Denver Public Schools.

Read More