Fort Leavenworth Regional Correctional Facility

Project Profile

Fort Leavenworth Regional Correctional Facility

Let’s Build

Partner with us on your next project.

Owner

U.S. Army Corps of Engineers | U.S. Department of Justice

Client

JE Dunn Construction

Size

223,650 sq ft

Each building is heated and cooled by a geothermal source heat pump system, which was selected based on its ability to produce a highly energy-efficient building. The housing areas utilize 100%-outside-air heat recovery units, which condition the air through a water-source heat pump. The design-assist team used a collaborative approach to define scopes of work and hard pricing at the proposal stage of the project during the design.

MECHANICAL HIGHLIGHTS 
  • preconstruction
  • integrated Internet-based automation system
  • geothermal heating and cooling
  • HVAC piping
  • fuel systems
  • preconstruction
  • sheet metal
  • plumbing