Read More
Featured - Healthcare - Rocky Mountain Region
UCHealth Poudre Valley Hospital
- The Beck Group
- 143.000 sq ft
Owner
Blue Springs School District
The Blue Springs South High School project consisted of replacing existing air units. A portion of the project took place while classes were in session and required helicopter assistance for installation. U.S. Engineering, with minimum disruption under a tight schedule, optimized facility operations using high-efficiency mechanical systems.