FutureForward at Washington Square

Project Profile

FutureForward at Washington Square

Let’s Build

Partner with us on your next project.

Owner

Adams 12 Five Star Schools

Client

Adolfson & Peterson

Size

50,495 sq ft

U.S. Engineering Construction provided design-assist mechanical services for Adams 12 Five Star Schools’ FutureForward at Washington Square Facility, which expands the district’s Career & Technical Education (CTE) programs. Our scope included piping, plumbing, sheet metal, controls, test and balance, and preconstruction support, ensuring the building was equipped for a variety of specialized learning environments.

Sustainability was a cornerstone of this project. Heating and cooling are provided by a ground-source geothermal system supported by heat pumps and energy recovery ventilators, helping the district meet long-term energy efficiency goals.

Through close collaboration between our field teams, office staff, and trade partners, we coordinated installation that met manufacturer requirements while ensuring long-term service accessibility. After completion, U.S. Engineering Construction facilitated meetings between CTE educators and local pipefitting unions to begin building direct pathways from high school classrooms into the skilled trades.