United Therapeutics - WARP10

Project Profile

United Therapeutics - WARP10

Let’s Build

Partner with us on your next project.

Owner

United Therapeutics

Client

DPR Construction

Size

222,000 sq ft

The United Therapeutics WARP10 facility in Research Triangle Park, North Carolina, is the first cGMP pharmaceutical manufacturing building made of mass timber to achieve Net Zero Energy performance.

Developed in partnership with DPR Construction and Ewing Cole, this groundbreaking project will include production areas, warehouse storage, packaging, device manufacturing, laboratories, offices, conditioned shell space, and a central utility plant.

Design-assist efforts with Ewing Cole began in late 2024, and on-site construction is projected to conclude in February 2027.

MECHANICAL HIGHLIGHTS 
  • Comfort piping and utility steam systems
  • Procurement and installation of major mechanical equipment
  • Air-to-water and water-to-water heat pumps
  • Boiler plant, chillers, cooling towers, and custom AHUs
  • Hydronic pump systems and delivery logistics
A modern building lobby with large windows, a central staircase with metal railings, indoor plants, chairs, a rug, and people walking or standing on both floors. Walls and ceilings feature wood accents.
A modern two-story building with large glass windows and a flat, overhanging roof, surrounded by landscaped greenery under a partly cloudy sky.
A modern open-plan office with cubicles, multiple computer monitors, and ergonomic chairs. Several people are working or walking around. The space features wooden ceilings, exposed ductwork, and large windows.
A modern two-story building with large glass windows, surrounded by greenery and a paved road in front. The sky is mostly clear with a few wispy clouds.