Read More
Industrial
Microvast Battery Plant
- Clarksville, TN
- DPR Construction
- 550,000 sq ft
Owner
Ford Motor Company
Size
350,000 sq ft
Full-service design/assist-build for HVAC, plumbing, and process installation for the 350,000-sq-ft PN 96 Commercial Truck Body Shop at Ford’s Claycomo, Mo., Assembly Plant. The scope included installing and hooking up fifteen 46,000-CFM air handling units; plumbing; and installing a process utility distribution of welder water cooling system, compressed air, and city water. U.S. Engineering also performed work on a new kitchen and locker room.