1STBANK Center

Project Profile

1STBANK Center

Let’s Build

Partner with us on your next project.

Owner

1STBANK Center

Client

Saunders Construction

Size

150,000 sq ft

This multi-use facility is the center of a fast-growing corridor on the Front Range. In this project U.S. Engineering was responsible for fabricating and installing all mechanical systems, including piping, plumbing and sheet metal. At 150,000 sq ft, the facility includes 310 plumbing fixtures, consisting of 120 water closets, 40 urinals and 40 shower valves.

MECHANICAL HIGHLIGHTS 
  • 4 46,000-cfm gas-fired/DX cooling rooftop units
  • condenser water loop consisting of 46 water source heat pumps
  • variable-volume rooftop unit
  • constant-volume gymnasium
Two people in reflective safety vests and hats stand on a sidewalk, smiling. Behind them is a sign reading “Adopt a Street Litter Control Next Mile – US Engineering.” Houses and a road are visible in the background. A man wearing a purple cap and gray shirt stands at the door of a blue mobile unit labeled “Children’s Hospital Colorado,” smiling and giving a thumbs-up gesture with both hands. Two people wearing blue hard hats, yellow safety vests, gloves, and glasses stand on a rooftop with a city skyline and several tall buildings in the background. Two people in reflective safety vests and hats stand on a sidewalk, smiling. Behind them is a sign reading “Adopt a Street Litter Control Next Mile – US Engineering.” Houses and a road are visible in the background.