Healthcare Aurora, CO

University of Colorado Hospital Inpatient Tower and Critical Care Wing Expansion

U.S. Engineering played an integral role in the multi-trade prefabrication on the University of Colorado Hospital project.

SIZE


665,000 sq ft

Led by general contractor Haselden Construction, this expansion project leveraged a high level of prefabrication to save time and money and reduce safety risks.

Located on the Anschutz Medical Campus, the 665,000-sq-ft expansion included a new state-of-the-art tower and critical care space. The addition provides 144 beds, a new emergency department, surgery floor, imaging department, auditorium and kitchen.

U.S. Engineering took the lead on this design-assist project, ensuring that the design was on track and making sure that the needs of UCH were met. By implementing multi-trade prefabrication, U.S. Engineering completed mechanical systems rough-in two months ahead of the aggressive schedule.

SCOPE OF WORK
  • Built up custom fan wall technology AHU’s
  • 2 heat recovery chillers
  • Multi-trade prefabrication
See where our innovative thinkers and expert collaborators can take you.