Contact us
Healthcare Denver, CO

Exempla Saint Joseph Hospital Heritage Project

OWNER


Exempla Healthcare

CLIENT


Mortenson Construction

SIZE


865,500 total sq ft | 21,000-sq-ft CUP | 306,900-sq-ft parking garage

Prefabrication process

U.S. Engineering was a key partner in the successful completion of this project, and the company was featured in Mortenson Construction’s video (also see the infographic at the end of this page):

The new replacement hospital is 827,300 sq ft and features a remote 21,000-sq-ft central plant, a new 306,900-sq-ft parking garage/retail space and a 38,200-sq-ft remodel of the Russell Pavilion (medical office building).

The eight-story hospital includes 350 patient rooms, 24 ORs, multiple pharmacy and lab areas, including a BSL-3 ready lab, multiple dietary areas, including a kitchen, labor and delivery rooms, various office and support spaces and a two-story equipment room on the third level with 17 AHUs. The building is topped with a rooftop helipad.

U.S. Engineering streamlined construction of this design-assist project by leading the multi-trade prefabrication of more than 260 corridor racks.

SCOPE OF WORK 
  • preconstruction, BIM coordination and prefabrication
  • 3 1,000 ton chillers
  • 3 3,000 gpm/ 262,820 cfm cooling towers on roof
  • 3 700 horse power dual fuel boilers
  • 2 25,000 – gallon underground fuel tanks
  • 17 air handling units
  • med gas
  • two-story central plant
  • prefabricated 427 patient room headwalls
 
Healthcare
North Colorado Medical Center

Greeley, CO

 
Healthcare
Poudre Valley Hospital NICU

Ft. Collins, CO

 
Healthcare
McKee Medical Center Renovations

Loveland, CO

 
Government | Healthcare
National Jewish Center for Outpatient Health

Denver, CO

See where our innovative thinkers and expert collaborators can take you.
Contact Us