Comcast Potomac Data Center – Phases 1 and 2

The Comcast Potomac data center project consisted of a two-phase remodel and conversion of an existing warehouse for this mission-critical facility. U.S. Engineering designed, fabricated, and constructed modules for the mechanical system, delivering two-piece, 90,000-lb. skids.

OWNER


Comcast

CLIENT


Saunders Construction (Phase 1) Executive Construction Inc. (Phase 2)

SIZE


60,000 sq ft warehouse-to-data-center conversion | 9,500 sq ft white space

Phase 1 consisted of converting the current warehouse into a 60,000 sq ft data center, which included 9,500 sq ft of white space with 2.7 MW of IT load. Phase 2 of the project, which consisted of an addition to the existing warehouse, required the project team to complete the design, build, start-up and commissioning within a tight schedule of only six months. The mechanical system features prefabricated modules—designed, fabricated, and constructed by U.S. Engineering—which house the chiller, chilled and condenser pumps, expansion tank, heat exchanger, chemical treatment and controls.

MECHANICAL HIGHLIGHTS
  • modular construction
  • prefabrication and preconstruction
  • 750-ton prefabricated chiller
  • two-piece 90,000-lb. prefabricated skids
  • 4 84,000 cfm custom air handling units
  • Liebert XD system components
  • 1.8 mw of redundant IT power
  • 750-ton cooling tower
  • 3 data floor air handling units
  • 4 CRAC units
  • 2 AC units
  • 4 chilled and condenser water pumps
  • underground HDPE condenser water “B” loop piping
 
Data Center
NCAR Wyoming Supercomputing Center

Cheyenne, WY

 
Data Center
Data Center Expansion

Kansas City, MO

 
Data Center
Sprint PCS Data Center

Lee’s Summit, MO

 
Data Center
Confidential Data Center

Kansas City, MO

See where our innovative thinkers and expert collaborators can take you.
Contact Us